An undefined product concept
The original request concerned a plastic front panel, without a complete hardware specification.
Project Example / Access Control Hardware
Developing Complete Hardware from a Hand Sketch
Starting with a hand sketch and broad functional requirements, Actech developed the mechanical concept and coordinated specialist suppliers to deliver assembled, tested and packaged hardware for the customer to configure with its own software.
01 / THE STARTING POINT
A plastic front-panel request became a broader hardware-development project, with the product definition and mechanical structure still to be resolved.
The original request concerned a plastic front panel, without a complete hardware specification.
The customer needed help translating functional requirements into an appearance concept, component layout and manufacturable structure.
The existing LCD specification and available assembly space required repeated adjustments to resolve interference between parts.
02 / OUR RESPONSE
Actech defined the mechanical concept and coordinated the specialist contributions needed to deliver complete hardware.
Actech proposed appearance concepts, clarified the requirements and developed the mechanical design and 3D CAD.
The customer specified the fingerprint and RFID readers. Actech helped select other components, sourced an industrial computer supplier and served as a single point of contact.
The front panel, rear housing, LCD, fingerprint reader, RFID reader and industrial computer module were integrated through assembly, functional testing and packaging.
03 / PUTTING IT INTO PRACTICE
The design progressed through sample adjustments, a pilot build and production, followed by a change to rear-housing fabrication.
An injection-molded front panel and laser-cut sheet-metal rear housing balanced appearance with the initial tooling investment.
Approximately 3–4 sample versions incorporated requirement details, LCD fit adjustments and findings from assembly.
A pilot run preceded production. Actech made assembly and functional-test fixtures to check RFID, fingerprint, display and I/O.
Hardware was assembled, functionally tested and packaged. Rear-housing fabrication later changed to NCT (CNC turret punching).
04 / WHAT CHANGED
From initial engagement to first production
First production batch
After switching from laser cutting to NCT
This reduction applies to the rear housing, not to the complete product or total project cost.
The collaboration ran approximately from 2006 to 2024. Later batches were approximately 200–300 sets, each fully assembled, functionally tested and packaged before shipment.
An early concept became complete hardware, with mechanical adjustments supporting later changes to the host-computer specifications.
05 / KEY TAKEAWAY
Mechanical design, specialist sourcing and coordinated production turned an early concept into complete hardware for the customer’s own system.